F. Sáenz de Ormijana y Valdés,A.Capote del Villar
Ferrovail Agromán, S.A.
ABSTRACT
The original Villarpando dam included an earth fill section with a length of 600 m which was badly damaged during Hurricane George in 1998. The dam has been reconstructed with low-paste RCC. The main details of the design and the construction work are described in the article.